CRCF (Carbon Removal and Carbon Farming Framework)

Beta obligation tracklast checked 2026-08-31 · weekly · monitored since 2026-08-27

Who is reading?

The six answers are the same for everyone. Which order you read them in, and the path through them, is not.

The CRCF is the European Union's voluntary certification framework for carbon removals, carbon farming and carbon storage in products. Regulation (EU) 2024/3012 was signed on 27 November 2024 and entered into force on 26 December 2024. It is not an offset scheme and it is not a compliance obligation: it sets quality criteria, mandates third-party verification, and promises an EU registry. What it certifies is a unit; what it does not yet do is tell you what that unit is worth or who must buy it.

Through 2026 the scaffolding went up fast. The Commission adopted Implementing Regulation (EU) 2025/2358 in November 2025 setting the rules for certification schemes, certification bodies and audits. Delegated Regulation (EU) 2026/285 followed on 3 February 2026 with the first three methodologies — DACCS, BioCCS and biochar. A second delegated act covering carbon farming (mineral soils, peatland rewetting, afforestation) was adopted in July 2026 and, per the Commission, the carbon farming methodologies are expected to enter into force in the third quarter of 2026. Carbon storage in buildings is scheduled for publication by end 2026.

The gap between framework and market is the story. As of the Commission's own published table, five certification schemes — Isometric, Puro.Earth, Rainbow Standard, Oncra and Planet First Registry — have applied for recognition and every one is still marked 'in progress'. Not one has been recognised. The EU Registry that is meant to prevent double counting is not due until 27 December 2028. There is no published CRCF unit price, no compliance demand, and the Buyers Club is a voluntary demand-aggregation platform aiming at its first purchases by December 2026. For an Indian reader the practical question — whether an activity located outside the Union can ever be certified under CRCF — is not answered on any Commission page read this pass and is recorded below as unknown, not as no.

The six slots

CRCF (Carbon Removal and Carbon Farming Framework) — the six slots Six fixed slots. Green is settled and actionable, orange is in motion, a dashed grey outline means nothing exists yet. Each box links to its section. Trigger In force since Dec 2024 — and it is voluntary Requirement Third-party audit, EU registry, scheme recognition Instruments 3 methodologies live, 3 adopted, 1 still to come Readiness Five applicants, zero recognised schemes Economics No price, no mandated demand — a club, not a market Response Schemes are queueing; buyers are being convened Settled In motion Nothing exists yet
  • Trigger — In force since Dec 2024 — and it is voluntary Settled
  • Requirement — Third-party audit, EU registry, scheme recognition Settled
  • Instruments — 3 methodologies live, 3 adopted, 1 still to come In motion
  • Readiness — Five applicants, zero recognised schemes Absent
  • Economics — No price, no mandated demand — a club, not a market Absent
  • Response — Schemes are queueing; buyers are being convened In motion

Observer

Advisor, investor, journalist or policy analyst tracking how the EU regulates removal quality

  1. 1TriggerSettled

    In force since Dec 2024 — and it is voluntary

  2. 2RequirementSettled

    Third-party audit, EU registry, scheme recognition

  3. 3InstrumentsIn motion

    3 methodologies live, 3 adopted, 1 still to come

  4. 4ReadinessAbsent

    Five applicants, zero recognised schemes

  5. 5EconomicsAbsent

    No price, no mandated demand — a club, not a market

  6. 6ResponseIn motion

    Schemes are queueing; buyers are being convened

Project developer or supplier

Developing a removal or land-based project and wondering whether CRCF is a route to market

  1. 1InstrumentsIn motion

    3 methodologies live, 3 adopted, 1 still to come

  2. 2ReadinessAbsent

    Five applicants, zero recognised schemes

  3. 3TriggerSettled

    In force since Dec 2024 — and it is voluntary

  4. 4EconomicsAbsent

    No price, no mandated demand — a club, not a market

  5. 5RequirementSettled

    Third-party audit, EU registry, scheme recognition

  6. 6ResponseIn motion

    Schemes are queueing; buyers are being convened

Corporate buyer

Buying removals and needing to know whether a CRCF label yet means anything purchasable

  1. 1ReadinessAbsent

    Five applicants, zero recognised schemes

  2. 2EconomicsAbsent

    No price, no mandated demand — a club, not a market

  3. 3InstrumentsIn motion

    3 methodologies live, 3 adopted, 1 still to come

  4. 4ResponseIn motion

    Schemes are queueing; buyers are being convened

  5. 5TriggerSettled

    In force since Dec 2024 — and it is voluntary

  6. 6RequirementSettled

    Third-party audit, EU registry, scheme recognition

The slots in full

Trigger Settled

Why does this reach me?

The instrument is in force and its scope is now read from the enacting terms: the framework's quality criteria apply to activities that take place in the Union. Checked 31 Aug 2026.

  • Regulation (EU) 2024/3012 entered into force on 26 December 2024

    The act is dated 27 November 2024. EUR-Lex's ELI metadata records first date of entry into force as 2024-12-26.

    EUR-Lex, Regulation (EU) 2024/3012, ELI record · checked 2026-08-31 verified

  • The CRCF is a voluntary certification framework, not a compliance obligation

    The Commission describes it as the first EU-wide voluntary certification framework, covering permanent carbon removals, carbon farming, and carbon storage in products. Nobody is required to certify, and no EU instrument yet requires anyone to buy a CRCF unit.

    European Commission DG CLIMA, CRCF Regulation page · checked 2026-08-31 verified

  • Three activity families are in scope, each with its own permanence expectation

    Permanent removals (storage for centuries), carbon farming, and carbon storage in products, which the Commission defines as capturing and storing CO2 for at least 35 years in long-lasting products.

    European Commission DG CLIMA, CRCF certification methodologies page · checked 2026-08-31 verified

  • A certification scheme based outside the EU is contemplated by the recognition process

    The Commission's recognition procedure states that schemes located in third countries are evaluated for accreditation suitability by the European Cooperation for Accreditation rather than a National Accreditation Body. This concerns the location of the scheme, not the location of the certified activity.

    European Commission DG CLIMA, CRCF certification schemes page · checked 2026-08-31 verified

  • Article 1(1)(a) confines the framework's quality criteria to activities that take place in the Union

    Article 1(1) of Regulation (EU) 2024/3012 establishes a voluntary Union framework for the certification of carbon removals and soil emission reductions by laying down, at point (a), "quality criteria for activities that take place in the Union". Points (b) to (d) cover verification and certification, the recognition of certification schemes, and the issuance and use of certified units. The geographic limitation sits on the activity, not on the certification scheme: a scheme established outside the EU can still be recognised under the Regulation, which is why the two must not be conflated. Read from the enacting terms on EUR-Lex, not from a summary page.

    EUR-Lex, Regulation (EU) 2024/3012, Article 1(1)(a), enacting terms · checked 2026-08-31 verified

Richard’s view

The word doing the most work here is 'voluntary'. CRCF is being read in India as a European CBAM-style pressure, and it is not that. It is a quality standard looking for demand, which is a different animal and a different risk.

Next step Someone else

Read the Regulation and the Commission's own scope pages

Regulation (EU) 2024/3012 on EUR-Lex, and DG CLIMA's CRCF Regulation page.

No commercial relationship. These are the primary documents, linked directly.

Requirement Settled

What would have to be true, in numbers?

The procedural requirements are notified and in force; the activity-level numeric criteria live in the delegated acts, one of which is not yet in force. Checked 31 Aug 2026.

  • Third-party verification is mandatory, not optional

    The Regulation mandates third-party verification of carbon removals and soil emission reductions, and the publication of certification-related information in an EU-wide registry.

    European Commission DG CLIMA, CRCF Regulation page · checked 2026-08-31 verified

  • Implementing Regulation (EU) 2025/2358 sets the technical rules for schemes, certification bodies and audits

    Adopted November 2025. It also allows group certification for carbon farming, which is the provision that decides whether smallholders can participate at all.

    European Commission DG CLIMA, CRCF Regulation page, citing Implementing Regulation (EU) 2025/2358 · checked 2026-08-31 verified

  • Recognition of a certification scheme is a Commission decision, normally valid for five years

    The published process runs seven steps from submission through eligibility check, technical compliance assessment, a written compliance report marking each requirement compliant, non-compliant or requiring clarification, an iterative clarification phase, confirmation, and a formal Commission decision.

    European Commission DG CLIMA, CRCF certification schemes page · checked 2026-08-31 verified

  • Schemes must run registries that prevent double counting and trace certificates across their lifecycle

    Alongside robust governance, an internal monitoring system, a requirement that operators apply the relevant CRCF methodology, and regular audit by accredited or recognised certification bodies.

    European Commission DG CLIMA, CRCF certification schemes page — recognition criteria · checked 2026-08-31 verified

What does not exist

The numeric thresholds inside the adopted methodologies — baselines, additionality tests, permanence and liability periods per activity

These are what an operator actually has to hit, and they sit in the text of Delegated Regulation (EU) 2026/285 and the July 2026 carbon farming act, neither of which was read line by line this pass. Until they are, this track can say what must be done procedurally but not what must be true numerically.

Monitored since 2026-08-31 · last checked 2026-08-31

Next step Someone else

Implementing Regulation (EU) 2025/2358

The consolidated text on EUR-Lex, plus the Commission's FAQ on IR 2025/2358 and DR 2026/285 published on the certification schemes page.

No commercial relationship. Both documents are free and official.

Instruments In motion

What counts as a valid response?

Three methodologies are in force, three more were adopted in July 2026 but are not yet in force, and one is unwritten. Checked 31 Aug 2026.

  • Delegated Regulation (EU) 2026/285 sets the first three certification methodologies: DACCS, BioCCS and biochar carbon removal

    The Commission's press release on the permanent removals delegated act is dated 3 February 2026 and describes it as the world's first voluntary standard for permanent carbon removals.

    European Commission DG CLIMA, CRCF certification methodologies page, citing Delegated Regulation (EU) 2026/285 · checked 2026-08-31 verified

  • A carbon farming delegated regulation covering three activities was adopted in July 2026

    Agriculture and agroforestry on mineral soils; rewetting and restoration of peatlands and other organic soils; afforestation. The Commission states the carbon farming methodologies are expected to enter into force in the third quarter of 2026.

    European Commission DG CLIMA, CRCF certification methodologies page and EU CRCF Buyers Club page · checked 2026-08-31 verified

  • A methodology for carbon storage in buildings is planned for publication by the end of 2026

    Aimed at bio-based construction products, and linked to the revised Energy Performance of Buildings Directive, which lets owners show carbon storage capacity on an Energy Performance Certificate. The technical assessment paper underpinning it was published in December 2025.

    European Commission DG CLIMA, CRCF certification methodologies page · checked 2026-08-31 verified

  • Enhanced rock weathering, mineralisation, ocean alkalinity enhancement and direct ocean capture are explored but not adopted

    The Commission lists these as pathways under consideration and has published review studies on each — enhanced rock weathering December 2025, ocean alkalinity enhancement February 2026, direct ocean capture and mineral carbonation June 2026. Studies are not methodologies.

    European Commission DG CLIMA, CRCF certification methodologies page — future of permanent carbon removals · checked 2026-08-31 verified

What does not exist

Any methodology for livestock emission reductions

The Commission held a workshop on certifying livestock emission reductions on 4 February 2026, but no methodology has been adopted or scheduled on the published page. For any agricultural economy, livestock is where the emissions are, and it remains outside the framework.

Monitored since 2026-08-31 · last checked 2026-08-31

Richard’s view

The methodology list is the honest measure of what CRCF can certify. Three of the six adopted activities are engineered; the land-based three arrived eighteen months later and are still waiting to enter into force. That ordering tells you where the Commission thought the verification problem was easiest, not where the tonnes are.

Next step Someone else

The Commission's methodologies page and the delegated acts

DG CLIMA's certification methodologies page carries the current list and links each adopted delegated regulation on EUR-Lex.

No commercial relationship. Official and free.

Readiness Absent

Can this actually be done today?

Five schemes have applied for recognition and every one is still marked in progress; no scheme is recognised, so no CRCF unit can yet be issued. Checked 31 Aug 2026.

  • Five certification schemes have applied for recognition and none has been recognised

    The Commission's published applications table lists Isometric (applied June 2026), Puro Earth (June 2026), Rainbow Standard (July 2026), Oncra Certifications (July 2026) and Planet First Registry (July 2026). The EC technical assessment column reads 'In progress' for all five.

    European Commission DG CLIMA, CRCF certification schemes page — applications table · checked 2026-08-31 verified

  • Recognition applications are handled first-come, first-served, and only against methodologies already in force

    Which is why all five applications arrived after February 2026: DR 2026/285 was the first methodology anyone could apply against.

    European Commission DG CLIMA, CRCF certification schemes page — recognition process · checked 2026-08-31 verified

  • Accreditation runs in parallel with Commission assessment, through a National Accreditation Body or, for third-country schemes, the European Cooperation for Accreditation

    The Commission advises schemes to open the accreditation conversation at the same moment they apply for recognition, because the accreditation outcome feeds the technical compliance assessment.

    European Commission DG CLIMA, CRCF certification schemes page · checked 2026-08-31 verified

What does not exist

The EU CRCF Registry does not exist yet

The Regulation requires the Commission to establish a Union registry platform, and the deadline is 27 December 2028. Until it exists, the double-counting protection the framework advertises rests entirely on the individual schemes' own registries.

Monitored since 2026-08-31 · last checked 2026-08-31

No published expected decision date for any of the five pending recognitions

The seven-step process includes an open-ended clarification phase that the Commission says 'may continue until all outstanding issues are fully addressed'. Nothing on the page commits to a timetable, so a developer planning around a CRCF route to market has no date to plan against.

Monitored since 2026-08-31 · last checked 2026-08-31

Richard’s view

This is the slot that should stop anyone treating CRCF as available. The rulebook is written and the queue has formed, but on 31 August 2026 there is still no recognised scheme, which means there is not yet a single certified CRCF unit in existence.

Next step Someone else

Watch the Commission's applications table

The certification schemes page publishes each applicant, its application month and its assessment status. It is the only authoritative record of who is close.

No commercial relationship. We link the Commission's own table rather than a market tracker.

Economics Absent

What does it cost, and what is it worth?

No official price, no compliance demand, and no completed transaction published by the Commission. What exists is a stated intention to buy. Checked 31 Aug 2026.

  • The EU CRCF Buyers Club is a voluntary demand-aggregation platform, not a purchase guarantee

    Announced in the EU Bioeconomy Strategy in November 2025 'to create predictable demand for results-based schemes and stimulate private investment', with initial details given at CRCF Days in May 2026. The Commission provides methodologies, scheme recognition and the registry; members identify projects, do their own due diligence and conclude their own contracts.

    European Commission DG CLIMA, EU CRCF Buyers Club page · checked 2026-08-31 verified

  • The Club aims to make an initial set of purchases of permanent carbon removals by December 2026

    Eligibility this year focuses on projects using the three approved permanent removal methodologies, with a stated strong preference for projects already receiving public funding from the Commission or Member States, and an aim of multi-year offtakes that take a few large projects to Final Investment Decision.

    European Commission DG CLIMA, EU CRCF Buyers Club page · checked 2026-08-31 verified

  • A Commission proposal on national targets and flexibilities, expected in Q4 2026, will examine developing a voluntary EU CRCF market further

    The Commission frames this as a key enabler for Member States to meet their climate targets. It is a proposal, not law, and nothing about it is settled.

    European Commission DG CLIMA, EU CRCF Buyers Club page · checked 2026-08-31 verified

What does not exist

There is no published price, price range, or price index for a CRCF-certified unit

No CRCF unit has been issued, because no scheme has been recognised, so there is nothing to price. Any figure quoted today as a 'CRCF price' is the price of something else — a scheme's own pre-CRCF credit — and should be read that way.

Monitored since 2026-08-31 · last checked 2026-08-31

No cost of certification is published: neither the audit and verification cost per project nor the scheme fee

For a smallholder or a mid-sized developer the certification cost, not the credit price, is usually what decides participation. IR 2025/2358 permits group certification for carbon farming precisely because of this, which is an admission that the individual cost is a barrier — but the number itself is nowhere.

Monitored since 2026-08-31 · last checked 2026-08-31

No completed Buyers Club deal has been published

The Club publishes a monthly bulletin, most recently July 2026, and describes a four-stage process ending in a completed deal. Whether any deal has reached that stage was not established this pass, and the December 2026 target is a stated aim rather than a record of anything done.

Monitored since 2026-08-31 · last checked 2026-08-31

Richard’s view

An empty economics slot on a framework this elaborate is the finding, not a failure to find. The EU has built quality infrastructure ahead of demand and is now trying to convene the demand by hand. That sequencing is unusual and worth watching, because it is the opposite of how CBAM or the ETS created their markets.

Next step Nobody yet

No price source exists

No provider identified. There is no CRCF unit price because no CRCF unit has been issued. Monitored since 31 August 2026; last checked 31 August 2026.

No commercial relationship, because there is nothing to route to. We will name a source when one exists rather than substitute a proxy price from another standard.

Response In motion

What are the options, and what are others choosing?

The observable choices today are made by certification schemes and by prospective buyers, not by operators, because operators cannot yet certify. Checked 31 Aug 2026.

  • Five established registries and standards have chosen to seek CRCF recognition rather than stay outside it

    Isometric, Puro Earth, Rainbow Standard, Oncra Certifications and Planet First Registry all applied between June and July 2026 — within roughly four months of the first methodology entering the statute book.

    European Commission DG CLIMA, CRCF certification schemes page — applications table · checked 2026-08-31 verified

  • The Commission is using a hybrid public-private model in 2026, with buyers making all project decisions themselves

    The published 2026 model splits responsibilities: the Commission supplies methodologies, scheme recognition, the registry and funding programmes; Club members identify projects, run due diligence, negotiate and contract. All final decisions and diligence on projects this year sit with the buyers.

    European Commission DG CLIMA, EU CRCF Buyers Club page · checked 2026-08-31 verified

  • For carbon farming the Commission is considering EU-wide calls for CRCF projects rather than individual purchases

    Modelled on the EIT Food 'Landscapes' regenerative agriculture programme, with bidding consortia assembling land managers from one region at transformative scale. The Fertiliser Action Plan of May 2026 announced that the Commission will consider an EU-wide call rewarding farmers for more efficient fertiliser use.

    European Commission DG CLIMA, EU CRCF Buyers Club page · checked 2026-08-31 verified

  • An Expert Group of around 70 members advises the Commission on methodology development

    Drawn from national authorities, business, NGOs and research institutions, meeting biannually. It is the formal route by which an outside view reaches a methodology before it is drafted.

    European Commission DG CLIMA, CRCF Regulation page — EU Expert Group on carbon removals · checked 2026-08-31 verified

What does not exist

No named list of Buyers Club members has been published

The Commission describes 'a coalition of key willing investors ranging from companies, financial investors, and public authorities' but names none. Without names there is no way to judge whether the demand being convened is real corporate demand or public money recycled.

Monitored since 2026-08-31 · last checked 2026-08-31

No Indian or wider third-country participation in any CRCF process has been identified

All five applicant schemes and the Buyers Club framing are European. Whether an Indian developer or standard has any pathway in is unresolved, and it turns on the unanswered geographic-scope question recorded in the Trigger slot.

Monitored since 2026-08-31 · last checked 2026-08-31

Next step Someone else

The Buyers Club monthly bulletin

The Commission publishes a monthly EU CRCF Buyers Club bulletin on developments and project pipeline; the July 2026 edition is the latest linked. Joining as a prospective buyer is via the Commission's own EU Survey form.

No commercial relationship with the Commission, the Buyers Club, or any of the five applicant schemes named on this track.

Not citable — deliberately withheld

ClaimWhy it is not used
That CRCF creates any obligation on Indian exporters or project developersIt does not. CRCF is voluntary and no EU instrument read this pass requires the purchase of a CRCF unit. Conflating it with CBAM would be the single easiest error to make on this subject, and it is being made elsewhere.
Any price for a CRCF unitNo unit has been issued. Prices quoted from Puro.Earth CORCs or similar are prices for those schemes' own pre-CRCF instruments, not CRCF units, and presenting them as CRCF prices would be inventing a market.

Beta — read this before you rely on a figure

What this is. Each track answers the same six questions about one subject and shows the date each answer was last checked. Every claim names the primary document it came from. Where something does not exist yet, that is stated with the date the watch began.

What beta means here. The system that assembles these pages is new. Slots may be drafted by an automated research process before an editor reviews them, and no page is published until a person has read it and signed it off. Some sources cannot be read automatically, and where that is true the page says so rather than reporting an unchanged figure.

Check the source before you act. These pages are a starting point for your own reading, not a substitute for it. Rules, prices, accreditations and eligibility lists change between checks, and a date on this page is the date it was last verified, not a guarantee it is current today. Every claim links to the document it came from. Use that document.

Not advice. Nothing here is legal, financial, compliance or investment advice, and it is not a recommendation to buy, sell or retire any carbon credit or to take any regulatory position. It does not create a client relationship. For a decision that carries money or liability, take professional advice on your own facts.

Interests to declare. Richard N. Bright is CEO of Carbon Registry India, a non-profit standard and an NCCF initiative, and provides paid advisory services. Where a track points a reader towards those, it is disclosed on that slot. Most slots point somewhere else, and some point nowhere, which is the honest answer more often than the field admits.

Corrections. If a figure here is wrong, say so and it will be corrected and dated. That is the fastest way to make this better, and it is welcome.

4 tracks · 82 sourced claims · 32 dated gaps · 27 primary sources monitored · last checked 31 Aug 2026 · 9 currently unreadable, reported as unknown rather than unchanged

Counted from the records on every page load, never typed. A dated gap is a question one of the six slots asks that has no answer yet — recorded with the day the watch began, rather than left blank. A source that cannot be read is reported as unknown rather than assumed unchanged.

Who writes this

Written and maintained by Richard N. Bright, CEO of Carbon Registry India — a non-profit carbon standard and an NCCF initiative.

LinkedIn

When something changes

These pages are re-checked on a schedule. Leave an address and you will hear when a track actually changes — at most once a week, never otherwise, and nothing else.

No list, no sequence, no sharing. One address, one purpose, and removed the day you ask.

Corrections

If a figure here is wrong, say so. It will be corrected, dated, and the correction left visible.

5 key reasons that makes Carbon Registry India ideal standard for India 5 things you should know about COP