A person placing a block into a pile of wooden blocks

CCTS Offset Mechanism: India approved the methodologies and never finished the rules

BEE has approved four offset methodologies that cannot be used as written. Two of them depend on programme-of-activities aggregation; two of them depend on a non-permanence risk assessment tool. Both instruments went out for public comment in June 2026, both windows closed in July, and as of today neither has produced an amended instrument. The methodologies are on the register. The rules they run on are not.

Six closed consultation windows, not four

Coverage of the CCTS Offset Mechanism has counted the project-level consultations — the draft Project Design Documents. There are four of those. There are also two rule-making consultations, and those are the ones that matter, because they amend the governing procedure rather than one applicant’s paperwork.

#Out for commentComments closedOutcome published?
1PDD — Kosher Climate India, Kosher Biogas Programme6 Mar 2026No
2PDD — Firstgreen Consulting, hydrogen from biogas methane12 Mar 2026No
3Draft detailed procedure for Programme Activities (PoA)8 Jul 2026No
4Draft Ecosystem-Based Approaches text edits + Non-Permanence Risk Assessment Tool13 Jul 2026No
5PDD — Navirex India, Distributed Hybrid Solar BESS Aggregation Pilot9 Sep 2026No
6PDD — Falcon Agrifriz Foods, biomass-based boiler9 Sep 2026No

Window 3 closed 69 days ago. Window 4 closed 64 days ago.

Why those two are the consequential ones

  • The PoA procedure is what lets distributed and smallholder activities register as one programme instead of one project at a time. Without it, aggregation has no route, and an activity whose unit economics only work in aggregate has no route either.
  • The Non-Permanence Risk Assessment Tool is what makes reversible removals — forestry above all — bankable, by defining how reversal risk is buffered. Without it there is no approved way to quantify the risk a buyer is being asked to carry.

Four approved methodologies depend on them

From BEE’s Methodologies and Tools page, last updated 7 July 2026 — five days before the second window even closed:

  • BM AG04.001 — methane recovery from livestock and manure management at households and small farms. Aggregation-dependent.
  • BM AG04.002 — improved management practices in rice cultivation. Aggregation-dependent.
  • BM FR05.001 — afforestation and reforestation of degraded mangrove habitats. Reversal risk.
  • BM FR05.002 — afforestation and reforestation of lands except wetlands. Reversal risk.

A household biogas methodology with no aggregation procedure is a methodology for a project nobody can afford to register alone. A mangrove restoration methodology with no non-permanence tool is a methodology whose central risk has no approved treatment.

The absence, checked rather than assumed

“The consultation closed and nothing happened” is only worth publishing if the outputs genuinely are not there. Two checks, both run again on 15 September 2026:

  1. The Detailed Procedure for the Offset Mechanism — the document both consultations propose to amend. A HEAD request returns 200 with a Last-Modified of Mon, 13 Apr 2026 04:51:36 GMT and a length of 39,881,882 bytes. That is three months before either window closed, and byte-identical to the reading taken earlier the same day. The file has not been touched.
  2. The Methodologies and Tools page, last updated 7 July 2026. Full text searched: “non-permanence” returns nothing; “ecosystem-based” returns nothing. The approved tool list runs BM-T-001 to 006, 008, 010, 011, 013, 014 and 015, plus forestry tools BM-T-AR-0002 to 0005. Sixteen tools, and no non-permanence tool at any number.

What this means if you are preparing an offset project

  • If your activity is aggregation-dependent, the procedure you would register under does not exist in final form. A PDD written against the current Detailed Procedure is written against a document that is under active amendment.
  • If your activity involves reversible removals, there is no approved buffer or risk-assessment method to price against.
  • Four PDDs have completed public comment. None of the four appears on the portal’s Listed Projects register, which still holds exactly one entry, a test record called “Test1308”. Registered Projects holds nothing at all.

What would change this reading

Any one of the following, and we are checking for each on a standing basis: the Detailed Procedure’s Last-Modified date moves; a non-permanence tool appears in the tool list; the PoA procedure is published in final form; or a real project replaces Test1308 on Listed Projects. We will date the change when it happens.

Sources

All primary, all on beeindia.gov.in and indiancarbonmarket.gov.in, all read on 15 September 2026: the Carbon Market document index; the Methodologies and Tools page, last updated 7 July 2026; the two consultation notices, last updated 10 June 2026 and 23 June 2026, with comment deadlines of 8 July and 13 July 2026 stated in their own text; a HEAD request against the Detailed Procedure PDF; and the ICM portal’s Listed Projects and Registered Projects registers.

Get this in your inbox

I maintain a working reference on India’s carbon market — which CCTS sectors are notified, which are actually operable, how many methodologies and accredited verifiers exist, and where CBAM stands. Subscribe and I will tell you when those facts change. No fixed schedule, and nothing sent for the sake of sending it.


Related Posts

Leave a Reply

Your email address will not be published. Required fields are marked *

5 tracks · 97 sourced claims · 43 dated gaps · 34 primary sources monitored · last checked 14 Sep 2026 · 10 currently unreadable, reported as unknown rather than unchanged

Counted from the records on every page load, never typed. A dated gap is a question one of the six slots asks that has no answer yet — recorded with the day the watch began, rather than left blank. A source that cannot be read is reported as unknown rather than assumed unchanged.

Who writes this

Written and maintained by Richard N. Bright, CEO of Carbon Registry India — a non-profit carbon standard and an NCCF initiative.

LinkedIn

When something changes

These pages are re-checked on a schedule. Leave an address and you will hear when a track actually changes — at most once a week, never otherwise, and nothing else.

No list, no sequence, no sharing. One address, one purpose, and removed the day you ask.

Corrections

If a figure here is wrong, say so. It will be corrected, dated, and the correction left visible.

5 key reasons that makes Carbon Registry India ideal standard for India 5 things you should know about COP