Am I obligated under CCTS? Every plant with a target, all sectors

CCTS compliance mechanism · every notified sector

If your plant has a greenhouse gas emission intensity target under India’s Carbon Credit Trading Scheme, it is named in one of the notifications below with a registration number, a 2023-24 baseline and a target. Choose your sector or search by company, town or registration number. Every row is read from the gazette, and each sector links to its own notification.

745entities named
8sectors
490under final notifications
255in the draft steel schedule
SectorEntitiesNotificationStatusWhat to know
Petroleum refinery21G.S.R. 794(E)FinalSchedule replaced by G.S.R. 794(E) on 7 Sep 2026. No 2025-26 target any more; seven Indian Oil refineries have different figures from January (shown under their target).
Iron and steel255G.S.R. 517(E)DraftStill a DRAFT (G.S.R. 517(E), 26 Jun 2026). Not binding until finalised. First target year 2026-27.
Cement186G.S.R. 739(E)FinalFinal since 8 Oct 2025 (G.S.R. 739(E)). Includes grinding units, registered CGUOE.
Textile173G.S.R. 794(E)FinalSchedule replaced by G.S.R. 794(E) on 7 Sep 2026. No 2025-26 target for any of the 173 units.
Pulp and paper53G.S.R. 739(E)FinalFinal since 8 Oct 2025 (G.S.R. 739(E)).
Chlor-alkali30G.S.R. 739(E)FinalFinal since 8 Oct 2025 (G.S.R. 739(E)).
Aluminium16G.S.R. 739(E), G.S.R. 25(E)FinalSmelters and refineries under G.S.R. 739(E); three secondary aluminium units added by G.S.R. 25(E).
Petrochemicals11G.S.R. 25(E)FinalFinal since 13 Jan 2026 (G.S.R. 25(E)). Unaffected by the September amendment.

Find your plant

Petroleum refinery: Schedule replaced by G.S.R. 794(E) on 7 Sep 2026. No 2025-26 target any more; seven Indian Oil refineries have different figures from January (shown under their target).

Iron and steel: Still a DRAFT (G.S.R. 517(E), 26 Jun 2026). Not binding until finalised. First target year 2026-27.

Cement: Final since 8 Oct 2025 (G.S.R. 739(E)). Includes grinding units, registered CGUOE.

Textile: Schedule replaced by G.S.R. 794(E) on 7 Sep 2026. No 2025-26 target for any of the 173 units.

Pulp and paper: Final since 8 Oct 2025 (G.S.R. 739(E)).

Chlor-alkali: Final since 8 Oct 2025 (G.S.R. 739(E)).

Aluminium: Smelters and refineries under G.S.R. 739(E); three secondary aluminium units added by G.S.R. 25(E).

Petrochemicals: Final since 13 Jan 2026 (G.S.R. 25(E)). Unaffected by the September amendment.

Entities named in CCTS greenhouse gas emission intensity target notifications, all sectors
Obligated entitySectorRegistrationBaseline
2023-24
Target
2025-26
Target
2026-27
Cut to 2026-27
Vedanta Limited, Jharsugud a, Smelter II, SEZ Unit, Bhurkhamunda, Jharsuguda, Odisha - 768202AluminiumALMOE001ODG.S.R. 739(E)13.8878tCO2e / t equivalent product13.723213.29654.26%
Mahan Aluminium Plant, Bargawa, Singrauli, Madhya Pradesh - 486886AluminiumALMOE002MPG.S.R. 739(E)15.6301tCO2e / t equivalent product15.421714.88064.80%
Bharat Aluminium Company Limited, B alco Nagar, Korba, Chhattisgarh - 495684AluminiumALMOE003CGG.S.R. 739(E)15.7129tCO2e / t equivalent product15.502314.95544.82%
Aditya Aluminium, At Post - Lapanga, Sambalpur, Odisha - 68212AluminiumALMOE004ODG.S.R. 739(E)16.1084tCO2e / t equivalent product15.887015.31204.94%
Vedanta Limited, Jharsuguda, Bhurkhamunda, Jharsuguda, Odisha - 7682 02AluminiumALMOE005ODG.S.R. 739(E)17.0814tCO2e / t equivalent product16.832416.18555.24%
Nalco Smelter & Power Complex, Angul / Nalconagar, Angul, Odisha - 759145AluminiumALMOE006ODG.S.R. 739(E)17.3505tCO2e / t equivalent product17.093716.42605.33%
Hindalco Industries Limited, Hirakud Smelter, Hirakud, Sambalpur, Odisha - 768016AluminiumALMOE007ODG.S.R. 739(E)19.1963tCO2e / t equivalent product18.881918.06375.90%
Hindalco Industries Limited, Renukoot, Sonbhadra, Uttar Pradesh - 231217AluminiumALMOE008UPG.S.R. 739(E)20.5549tCO2e / t equivalent product20.276719.55434.87%
Hindalco Industries Ltd, Post Bag - 1, Opp Yamanapur Village, Belgaum, Karnataka - 5900 10AluminiumALMOE009KAG.S.R. 739(E)0.5453tCO2e / t equivalent product0.53840.52074.51%
Utkal Alumina International Limited, Doraguda, Post - Kucheipedar, Rayagada, Odisha - 765015AluminiumALMOE010ODG.S.R. 739(E)0.8361tCO2e / t equivalent product0.82760.80573.64%
Vedanta Limited, Lanjigarh, Biswanathpur, Kalahandi, Odisha - 766027AluminiumALMOE011ODG.S.R. 739(E)0.9354tCO2e / t equivalent product0.92480.89734.07%
National Aluminium Company Limited, Mines & Refinery Complex, Damanjodi, Koraput, Orissa - 763008AluminiumALMOE012ODG.S.R. 739(E)1.1875tCO2e / t equivalent product1.17041.12595.19%
Hindalco Industries Limited, Muri Works, Ranchi, Muri, Ranchi, Jharkhand - 835101AluminiumALMOE013JHG.S.R. 739(E)1.3989tCO2e / t equivalent product–1.31056.32%
Hindalco Industries Limited, Plot No. 2, MIDC Taloja, A.V, Navi Mumbai, Dist Raigad, Maharashtra - 410208AluminiumALMOE014MHG.S.R. 25(E)1.3386tCO2e / t equivalent product1.33041.28004.38%
Hirakud FRP Plant, Hindalco Industries Ltd, Hirakud, Sambalpur, Odisha - 768016AluminiumALMOE015ODG.S.R. 25(E)1.1650tCO2e / t equivalent product1.15881.12083.79%
Hindalco Industries Limited – Mouda Works, Ramtek Road, Dahali, Mouda Dist, Maharashtra - 441104AluminiumALMOE016MHG.S.R. 25(E)1.4372tCO2e / t equivalent product1.42771.36964.70%

Get all 745 as a spreadsheet, and hear when your figures change

Every row, every sector, with the notification that names it, emailed to you. When a notification changes these targets, as G.S.R. 794(E) did for seven refineries in September, you will be told.

Free. Used only to send you this file and change alerts. Never sold or shared. Every email carries a one-click removal link.

How to read your row

A dash in 2025-26 means no target that year. Steel, refineries and textile units all start in 2026-27, as do a few plants in other sectors. Where a 2025-26 figure is printed, that year is binding.

Compare plants on the cut, not the baseline. Intensity is per tonne of equivalent product (per thousand barrels per complexity factor for refineries), and the scale differs by product. The cut is each plant measured against itself.

Not on the list? These are the sectors with a published plant list. If your sector is not here, no plant list has been notified for it yet.

What should we explain better?

A question this page leaves open, a sector or notification you want covered, or something that is unclear. Every question is read, and they decide what gets researched next.

Sources

G.S.R. 739(E) (final, 2025-10-08, CG-DL-E-09102025-266804) · G.S.R. 25(E) (final, 2026-01-13, CG-DL-E-16012026-269375) · G.S.R. 794(E) (final, 2026-09-07, CG-DL-E-21092026-276352) · G.S.R. 517(E) (draft, 2026-06-26, CG-DL-E-02072026-274012)

Each row was read from the English schedule of its gazette notification. The 490 rows under final notifications reconcile exactly to the totals the government published (282 and 208). Extracted 2026-10-02. If you find a discrepancy with the gazette, the gazette is right and we want to know.

5 tracks · 99 sourced claims · 43 dated gaps · 34 primary sources monitored · last checked 1 Oct 2026 · 10 currently unreadable, reported as unknown rather than unchanged

Counted from the records on every page load, never typed. A dated gap is a question one of the six slots asks that has no answer yet — recorded with the day the watch began, rather than left blank. A source that cannot be read is reported as unknown rather than assumed unchanged.

Who writes this

Written and maintained by Richard N. Bright, CEO of Carbon Registry India — a non-profit carbon standard and an NCCF initiative.

LinkedIn

When something changes

These pages are re-checked on a schedule. Leave an address and you will hear when a track actually changes — at most once a week, never otherwise, and nothing else.

No list, no sequence, no sharing. One address, one purpose, and removed the day you ask.

Corrections

If a figure here is wrong, say so. It will be corrected, dated, and the correction left visible.

5 key reasons that makes Carbon Registry India ideal standard for India 5 things you should know about COP